Scope

Asset

Duration

Access Technology

Major Services

Access Saving

Recognition

Outcome

Two 19-storey strata towers (210 apartments) above a busy retail precinct

25 weeks – delivered ahead of programme

PEARS® power-ascender system (Scaffold-Free™)

Remedial façade repairs & full repaint

≈ AUD $200,000 compared with conventional scaffolding

Finalist – NSW & ACT Awards for Excellence 2024 (Difficult Access, Highly Commended)

The Challenge

Elevated directly over a thriving shopping village, Eastgate Gardens presented classic “difficult-access” pain points:

Zero tolerance for footpath or traffic closures.

Aged coating systems on both towers requiring full remediation, yet only limited anchor infrastructure was available.

Residents needing quiet enjoyment and clear sightlines throughout the project.

Traditional full-height scaffolding would have blown out the budget, obstructed retail trade and extended the programme well past the strata committee’s deadline.

Our Solution

CPR’s director-led team designed an end-to-end remedial and repaint package anchored by our Portable Elevator Access Rope System (PEARS®):

Scaffold-Free™ Access – PEARS® power-ascenders and our Multiple Access Rope System (MARS®) created a dynamic web of safe work positions without a single scaffold tube.

Minimised Disruption – Quick, non-damaging rig-up each morning and silent operation kept residents, shoppers and motorists moving unimpeded.

Integrated QA – SkyGridding™ digital mapping logged every defect and repair in real-time, feeding into SFS360® quality checks and photographic records for warranty compliance.

Lean Programme Management – A 15-person Upseiling® crew cycled trades efficiently, allowing spray, roller and remedial teams to operate concurrently.

Results & Value Delivered

$200k Access Cost Saving - Eliminating scaffold hire, erection and dismantle fees returned significant capital to the owners corporation.

Time Saved - Completed ahead of schedule, compressing a forecast 30-week programme into 25 weeks.

Zero Business Interruption - Retail tenants reported no trading downtime, and strata management logged nil access complaints.

Award-Level Finish - Highly Commended in the 2024 Awards for Excellence (Difficult Access category).

Long-Life Protection - Wattyl Solagard® coating applied under ASP’S™ Accredited Service Partner supervision, backed by our 15-year AssetCare™ maintenance programme.

What the Client Said

“The works were completed ahead of schedule and the results are outstanding. Communication from the team was a feature, giving us confidence every milestone would be met.”Consultant, Ryter Management Pty Ltd

Why It Matters

High-rise remedial projects don’t have to drain capital or disrupt communities. By pairing Scaffold-Free™ technologies with rigorous quality systems, CPR slashes access costs and compresses programmes—delivering safer, quieter and more economical outcomes for strata, commercial and government assets alike.

Considering a
Façade Upgrade?