28-storey strata tower, 120 apartments, hemmed in by busy CBD traffic corridors
16 weeks – delivered on time despite tight CBD constraints
Scaffold-Free™ solution: PEARS® power-ascenders + SkyPod® catchment platforms
Narrow-render repairs, full façade repaint & remedial upgrade
Six-figure scaffold-hire costs and weeks of street-closure fees avoided
Zero incidents while working directly above an active heritage-building refurbishment
12-person specialist rope & remedial crew
Astoria Tower occupies a land-locked site in the heart of Sydney’s CBD, bordered by a Meriton Suites complex, a Wilson Parking station and a live construction site converting a heritage warehouse into “Prefecture 48”, a multi-million-dollar hospitality precinct.
With narrow footpaths, constant traffic and 28 storeys of hard-to-reach elevations, the Owners Committee had postponed a full façade upgrade for years, fearing:
CPR’s director-led team designed an end-to-end remedial and repaint package anchored by our Portable Elevator Access Rope System (PEARS®):
Scaffold-Free™ Access -
Our PEARS® rope-mounted elevators and modular SkyPod® workstations provided full-height coverage without blocking footpaths or views.
SkyPod® Catchment Safety –
Over 1,000 linear metres of narrow render repair were completed with integrated debris-catchment, protecting pedestrians and the heritage refurbishment below.
Lean Programme Management–
Upseiling® teams rotated render repairs, joint replacement and spray applications simultaneously, compressing the schedule and avoiding night works.
Premium Coating System –
Dulux Acratex® primer and topcoat system specified to combat intense CBD pollution and UV exposure, backed by an extended AssetCare™ warranty and maintenance plan.
Transparent QA–
SkyGridding™ defect mapping and daily photo logs gave CB Consultants and the committee real-time progress and compliance records.
Cost Efficiency – Removing full-height scaffold saved a substantial six-figure sum in hire, erection and dismantle fees, plus eliminated council street-closure charges.
Uninterrupted Operations – No lane closures, no retail downtime and minimal resident disturbance despite working metres above a live hospitality fit-out.
On-Time Delivery – Completed within the 16-week window, preventing penalty costs and allowing the adjacent Prefecture 48 project to maintain its own critical path.
Safety & Compliance – Zero LTIs; operations exceeded NSW WHS and CBD high-risk-work permit requirements.
Longevity – Warranty-backed coating and render system integrated into CPR’s AssetCare™ plan for hassle-free upkeep.
“We praise CPR for its persistence and ingenuity, noting their competitive pricing, innovative ascender and SkyPod® access systems, and ‘can-do’ attitude that keeps even complex high-rise projects on track. The team communicates clearly with owners and managers, adapts swiftly to on-site challenges—including issues with neighbouring properties—and delivers ahead of the deadline. The finished work is simply “remarkable,” leaving our building looking brand-new. We would recommend CPR to colleagues and anyone seeking a first-class façade upgrade.”
– Bishwan, Building Manager
Astoria Tower demonstrates that even the most congested CBD sites can undergo a full façade renewal without scaffold blow-outs, business disruption or safety compromises. CPR’s patented access technologies streamline delivery, cut costs and keep city life moving—delivering premium finishes that stand the test of time.
Reach out to know more about our bespoke access and remediation plans that
protects your asset—and your budget.
Why Wait? Contact us Now!
Your Scaffold-Free™ Consultants, Builders and Project Managers Delivering End-to-End Building Remediation and Facade Upgrades
Using our Patented SkyPod® Remedial Building Workstations
98 Victoria Road North Parramatta NSW 2151
CPR primarily services NSW and the ACT, with the ability to mobilise to other locations upon request and subject to project suitability.