Mariners Highrise, Case Study

Scope

Asset

Duration

Access Technology

Major Services

 

Access Saving

Resident Impact

 

Recognition

Outcome

13-storey strata tower, 49 apartments on the NSW Central Coast

18 weeks — delivered to program

Scaffold-Free™ Technology using PEARS® powered rope-access system

Rust spot repairs (balcony soffits) • Concrete spalling repairs • Render repairs (structural focus) •
Repaint incl. metal handrails & balustrades

≈ AUD $100,000 vs. full-height scaffolding

Provided tidy sequencing for residents, and a dependable programme—without lane closures
or months of scaffolding around the tower.

WinnerMaster Painters Australia, Awards for Excellence 2024 (Residential Multi-Unit Repaint > $200k, NSW & ACT)

The Challenge

A coastal high-rise facing salt-laden winds and corrosion needed comprehensive
remedial works without wrapping the building in scaffolding. As the builder and
owner, the client required premium materials, tidy sequencing for residents, and a
dependable programme—without lane closures or months of scaffolding around the
tower.

Our Solution

CPR’s director-led team designed an end-to-end remedial and repaint package anchored by our Portable Elevator Access Rope System (PEARS®):

Scaffold-Free™ Delivery

Installed and de-installed PEARS® to give safe, rapid full-height access with no scaffolds, hoarding or view loss.

Integrated Remediation

Executed rust spot, concrete spalling, and render repairs with a strict focus on structural integrity; repainted all metal handrails and balustrades.

High-Performance Coatings

System built around Acratex® AcraShield® Advance with DUREBILD® STEepoxy spot-priming and Fosroc primers/bonders for durable adhesion and coastal protection.

Resident-First Staging

The tower was divided into four vertical stages (~4 weeks each) to minimise disruption, supported by weekly updates and SFS360® quality checks.

Results & Value Delivered

≈ $100k saved in access costs by eliminating scaffold hire, erection and dismantling

On-programme completion across four stages with minimal resident impact

Coastal-grade protection and refreshed presentation using a premium, warranty-ready coating system.

Lifecycle care - The client engaged CPR for periodic AssetCare™ washing and touch-ups to preserve performance and appearance

What the Client Said

“CPR’s professionalism and quality were excellent, and not needing scaffolding was a key
reason we selected them. The building was split into four vertical stages, making it easier
for occupants, and we’ve now signed up for periodic maintenance and care going forward.”

– Michael Sahyoun — Builder & Owner

Why It Matters

Mariners Highrise shows how CPR’s Scaffold-Free™ approach cuts six-figure access costs, keeps residents happy and delivers coastal-tough protection—without the headaches of scaffolded sites.