Scope

Asset

Residents Feedback

Duration

Access Technology

Major Services

Access Saving

Recognition

Cost Impact

Outcome

Three luxury waterfront strata buildings, 9 storeys, 148 apartments

0 complaints logged across 148 apartments

15 weeks – delivered two months ahead of the original schedule

Scaffold-Free™ rope systems (PEARS® power-ascenders & MARS® grid)

Full façade sealant replacement, concrete repair & premium repaint

≈ AUD $200,000 compared with conventional scaffolding

Winner – Master Painters Australia “Residential Repaint > $200 K”, NSW & ACT 2024

Significant savings by eliminating full-height scaffolding and compressing programme timev—funds redirected to future maintenance reserve

The Challenge

Birkenhead Quays sits directly on the Parramatta River, exposing its rendered façades to high UV, salt spray and wind-driven rain.

Multiple failing joints and chalking coatings threatened water ingress and concrete spalling.

Traditional scaffold solutions would have blocked prized water views, encroached on common areas and pushed the budget past what the owners corporation had approved.

Our Solution

CPR’s director-led team designed an end-to-end remedial and repaint package anchored by our Portable Elevator Access Rope System (PEARS®):

Scaffold-Free™ Access -
Our PEARS® elevator ascenders and MARS® rope grid gave technicians full-height coverage without a single scaffold tube, keeping balconies, pathways and sightlines clear.

End-to-End Remediation –
Accredited Service Partner Abdul Noori led high-altitude teams who removed and replaced every sealant joint, treated balcony soffits and executed concrete spot-repairs before priming.

Premium Protective System –
Applied Dulux Acratex® AcraPrime solvent-based clear, followed by twin top-coats of AcraShield® Advance. Balcony soffits finished in Dulux Weathershield® Matt for a uniform, long-life result.

Live QA & Reporting –
SkyGridding™ defect mapping fed day-by-day progress reports to Luna Management and the strata committee, ensuring absolute transparency and warranty compliance.

Results & Value Delivered

Ahead of Time, Under Budget – Completed eight weeks early, slashing preliminaries and labour overheads while returning unspent contingency to the owners.

Access-Cost Avoidance – Rope-access methodology removed six-figure scaffold hire, erection and dismantle fees.

Zero Resident Disruption – No noisy tube-clamps, no blocked views, no driveway closures; not a single complaint logged from 148 residents.

Award-Winning Finish – Recognised by Master Painters Australia as the state’s top large-scale residential repaint for 2023 projects.

Long-Term Protection – Backed by CPR’s AssetCare™ maintenance programme and a Dulux warranty for enduring waterfront resilience.

What the Client Said

“I have been in the building industry for over 50 years; I have never seen a building of this size completed two months ahead of schedule and under budget… CPR are true professionals with qualified trade people. Out of 148 apartments, not one complaint. I would highly recommend them if you want friendly and hassle-free service.”

– Peter A., Committee Member

Why It Matters

Our patented Scaffold-Free™ technologies cut the biggest cost driver—access—while our director-led remedial crews deliver premium workmanship at pace. The Birkenhead Quays project proves that even large, waterfront complexes can achieve award-level finishes faster, quieter and more economically when CPR is on the ropes.

Ready to reduce risk,
cost, and duration on your
next façade project?