At CPR we don’t just patch a crack and leg it—we record the wins, the wobbles and the real-world dollars our clients keep in their pocket after we’re done. This page is your front-row seat to those stories.
At CPR we don’t just patch a crack and leg it—we record the wins, the wobbles and the real-world dollars our clients keep in their pocket after we’re done. This page is your front-row seat to those stories.
How Scaffold-Free™ tech like SkyPod®, Upseiling® and MARS™ gets us on-rope and off-site before morning tea.
Defect reduction, energy savings, insurance-premium drops and the blunt-end budget figures that make boards smile.
We’ll talk straight: no corporate fog, no cherry-picked “best bits”. Each case study shows the entire chain—from the first facade inspection right through to remediation and AfterCare™ maintenance. You’ll see the hurdles (weather, council permits, cranky tenants) and how our integrated model cleared them without a sea of scaffolding or a blow-out in programme.
Because everything sits under one roof—our rope techs, facade engineers, materials scientists and project managers share the same job number from day one.
hat means a single point of accountability, razor-sharp sequencing and zero scope gaps.
Keen to see how the CPR approach stacks up against your building’s pain points? Dive into the case studies below.